Derwent Skiff 5.5m - Hardware2 pairs of custom fittings to which the riggers attach to the gunwales 1 pair of custom 'wing' nuts that bolt the riggers to the above fittings 1 custom sliding nut that holds the foot stretcher down to its tracks 2 tracks for locating the foot stretcher in its fore and aft locations 2 timing belts cut into the parts for gluing to the keel and stretcher (these locate the stretcher setting along the keel) 1 Custom stainless steel plate to locate the front of the buoyancy tank to the keel 3 custom bolts for mounting the rigger to the buoyancy tank 3 custom captive nuts to receive the rigger attachment bolts 8 screws for attaching the custom plates to the gunwales 2 washers for the rigger mounting 2 screws to capture the forward buoyancy tank locating plate 4 screws to fix the wooden height blocks for the front of the buoyancy tank 2 bolts/nuts/washers to mount the forward attachement plate to the buoyancy tank 8 screws to mount the stretcher track to the keel 8 screws for the knees 4 screws for the skeg 2 Inspection ports for access into the buoyancy tank Mold Hardware: Screws for assembling the mold Screws to attach the stringers to the mold Screws to attach the keel, stem, and stern to the mold Small screws and washers for temporary clamping planks to keel and stem webmaster@wittdesign.com.au Secure payment services |
||||||||||||||||
Price SetPRICES CURRENTLY IN AUSTRALIAN DOLLARSSearch by Keyword |
||||||||||||||||